background image

10

Note:

 If you are installing the 760 Operator with

an extension arm, some of the constraints do not
apply to your gate leaf. See the section
"Installing an Extension Arm" for more
information (page 25).

Manual Release

Note:

  The 760 CBAC provides a Manual Release

for manually operating the gate.  Although the
760 SB and the 760 SBS come with this release
mechanism, it is not necessary to use this feature
to release the gate.  The SB and SBS have no
internal locking and can be pushed manually at
any time.

The Manual Release mechanism on the Standard
models is a built-in release device of the 760 Operator
(see Figure 6). This device is accessible from both
sides of the gate.  You disengage the hydraulic
operation of the operator by opening the access door
(there is one on either side of the manual release
housing), inserting the triangular key, and turning the
key toward the gate post one full turn.  Then you can
move the gate by hand to open or close the gate.
Operating the gate by hand is necessary during
installation and is useful during power failures.

To re-engage the hydraulic operation of the gate, turn
the key away from the gate post until resistance is met.

 

Open the access door 
to the release device

1.

2.

Insert the key and turn 
it one full turn toward the
gate post for release.

Figure 6. The Manual Release in the
760 Standard Operator

Installing the 760 Operator

Installing the 760 Operator consists of the following
steps:

 

Install the load bearing box, electrical
conduit, and drain pipe

 

Secure the load bearing box

 

Install the gate leaf shoe

 

Install the gate leaf

 

Install the operator in the load bearing box

 

Install the control panel

 

Adjust the hydraulic pressures for the
operator

 

Check the motor rotation

 

Fine-tune the bypass valve pressures

Install the Load Bearing Box

You need to excavate a cavity for the load bearing box
of the 760 Operator according to the dimensions
shown in Figures 4 and 7. (Your soil conditions will
also determine the size of the cavity.) Accurately
positioning the splined shaft of the pinion (inside the
mounting box) beneath the gate hinge is critical.
Proper alignment will ensure a full swing without
binding.

Note

: You need to insure that the load bearing box is

well drained by means of pipes, gravel drainage, or
both, whatever is appropriate for your soil conditions.
Use one of the access holes in the load bearing box for
the drainage pipe leaving the box.

Install your electrical conduit through another hole in
the load bearing box. Use conduit of sufficient size
and quality to accommodate the high-voltage wiring
that must run between the operator (in the load bearing
box) and the control panel.

Caution

: Be sure to conform to all applicable

electrical codes.

Summary of Contents for 760

Page 1: ...oe 11 Install the Gate Leaf 14 Install the Operator in the Load Bearing Box 14 Install the 450 MPS Control Panel 16 Connect the Main Power Supply 16 Connect the Operator s to the Control Panel 17 Chec...

Page 2: ...ough away from the road to eliminate the potential of traffic getting backed up This distance is affected by the size of the gate how often it is used and how fast the gate operates 2 The operator you...

Page 3: ...the equipment 3 If a gate system component malfunctions turn off the main power before making any attempt to repair it 4 Do not attempt to impede the movement of the gate You may injure yourself as a...

Page 4: ...t lb kg 1760 800 Maximum gate length ft m 7 2 1 10 3 13 4 Maximum angle of rotation deg 148 degrees 90 deg opening time sec 12 17 Nominal torque ft lb Nm 399 543 200 272 Your standard 220 VAC power so...

Page 5: ...are included 760 Operator Figure 1 Hydraulic pump drive assembly with a plastic shipping cover fitted over the rack Package containing 4 bolts and 4 lock washers for attaching the 760 Operator to the...

Page 6: ...ety of both people and property FAAC safety standards state that the gate should stop its movement if it encounters a force of more than about 33 lb The installer of the 760 Operator makes the necessa...

Page 7: ...hem after pause time Opens single leaf connected to Motor 1 and closes it after pause time No effect No effect No effect Off Opening Closes both leaves immediately Closes the leaf immediately Stops St...

Page 8: ...1 No effect opening is inhibited No effect opening is inhibited No effect opening is inhibited Off Opening Stops Stops Stops Stops gate closes when reversing device no longer triggered No effect On O...

Page 9: ...ate leaf has positive stops in both the opening and closing directions see Figure 5 Figure 5 Positive stops are required in the fully opened and fully closed gate positions 4 You need to determine a m...

Page 10: ...toward the gate post for release Figure 6 The Manual Release in the 760 Standard Operator Installing the 760 Operator Installing the 760 Operator consists of the following steps Install the load bear...

Page 11: ...d shaft of the pinion or the top edge of the box In fact you should recheck all alignments and adjust the mounting box if necessary Then you can pour concrete around the box and up to its top edge so...

Page 12: ...the holes on the opposite sides of the pipes Figure 8 A sample shear pin assembly Axis of rotation within body of gate leaf Axis of rotation outside body of gate leaf Splined shaft Splined shaft slee...

Page 13: ...d the splined collar into place on the bottom of the shoe s U shaped section If you are using the shear pin assembly spot weld the splined collar to the bottom of the shear pin assembly and spot weld...

Page 14: ...erator see Figure 14 Be sure to keep track of the plugs and the rack and pinion covers in case you ever need to remove the operator for repair Pinion cover Mounting box cover Bolt 1 of 4 Figure 13 Rem...

Page 15: ...and closing momentum completely before you operate the gate electrically The pressure valves are not preset at the factory and may operate the gate leaf with enough force to endanger people and serio...

Page 16: ...ain power breaker switch and for making sure that the entire gate system meets all applicable electrical codes Follow the instructions that follow to install the 450 MPS control panel for the 760 Oper...

Page 17: ...unction boxes depends on your gate design If any operator is more than 2 ft away from the U L Listed control panel enclosure the connection must be made inside a junction box Use a U L Listed cord gri...

Page 18: ...The terminal strip wiring of the 450 MPS with photobeams Figure 21 Wiring detail a inside the junction box and b from the junction box or operator to the high voltage terminal strip on the 450 MPS co...

Page 19: ...ns for installing such accessories follow Connect Other Devices WARNING Turn the main power off before you make any electrical connections or set any switches inside the control panel box Now you can...

Page 20: ...20 Figure 22 Common accessories wired to 450 MPS...

Page 21: ...en An electric lock can make use of the reversing stroke function controlled by DIP switch 5 A reversing stroke is a short closing phase that allows the electric lock time to disengage itself before t...

Page 22: ...positive stop for opening and for closing Leaf Delay You may choose to delay one leaf on closing for overlapping gate leaves Be sure the operator on the leaf for delayed closing is connected to Motor...

Page 23: ...en the brass lock nut Manually move the gate leaf to the fully opened position against the opened limit stop Loosen the brass lock nut for the opening brake adjustment bolt Next turn the square headed...

Page 24: ...slide this hex head into the brass fitting of the 760 Operator that is located on the same end as the bypass valve adjustment screws see Figure 29 Brass gear assembly Plastic gear assembly Figure 25 A...

Page 25: ...ing to Figure 30 Caution Do not weld anything to or on the inside of the sleeve of the splined shaft Next weld the outside of the sleeve for the splined shaft solidly to the inside of the hole in the...

Page 26: ...se check once per year Heavy duty use check every 6 mo Rack and Pinion When you remove the 760 Operator from the mounting box to change the hydraulic oil grease the rack and the pinion Light duty use...

Page 27: ...rs are running Solution Make sure that the motor is running in the right direc tion and make sure the Manual Release mechanism has fully engaged the hydraulic system Increase the bypass pressure in sm...

Page 28: ......

Page 29: ...UL strain relief kit 2167A 710914 710915 709020002 703930...

Page 30: ......

Page 31: ...t s or has been subject to misuse negligence or accident or has not been operated in accordance with FAAC International Inc s or FAAC S p A s instructions or has been operated under conditions more se...