Page | 53
15.2.
INSTALLATION
15.2.1.
Connect the call/send control cord to VPL by first removing rear cover panel.
15.2.2.
Locate the cord with a 3-pin connector inside the tower (this cord is positioned in the area
where the power cord exits the tower).
15.2.3.
Bring the cord out of the tower, connect the call/send control plug, and tuck the connected
plug back inside the tower (FIG. 15.2).
15.2.4.
Reinstall rear cover panel, ensuring that the notch is in the lower right corner (looking at the
back of VPL).
15.2.5.
Mount the call/send control securely using #10 bolts or screws (not included) in a suitable
location where it can be accessed easily by the VPL user.
15.2.6.
Secure the call/send control cord in such a manner that it will not interfere with the VPL
operation or pose a tripping hazard.
FIG. 15.2