Page | 32
9.5.
TOP LANDING GATE LATCH COVER
9.5.1.
PRIOR TO INSTALLATION
9.5.1.1.
The top landing gate latch cover (FIG. 9.6) is installed over the latch on the top
landing gate
(“gate”)
. Ensure that you have the properly handed (left or right)
latch cover for the gate. Always test fit prior to beginning installation.
9.5.1.1.1.
If the gate opens to the left as you exit the VPL platform, use a
LEFT latch cover (FIG. 9.7).
9.5.1.1.2.
If the gate opens to the right as you exit the VPL Platform, use a
RIGHT latch cover (FIG. 9.8).
FIG. 9.6
FIG. 9.7
LEFT OPENING
FIG. 9.8
RIGHT OPENING