EXTREME HEAT SOLAR
8
100
l
NO PRESSURE EVACUATED TUBE SYSTEM
1)
1 x Bag of bolts, nuts and washers
2)
4 x Foot pieces
3)
1 x Bottom horizontal frame (81 cm)
4)
2 x Horizontal frame (81 cm)
5)
2 x Side cross support (38 cm)
6)
4 x Long cross support (54.5 cm)
7)
2 x Side frame (204 cm)
8)
1 x Tube base (82 cm)
9)
2 x Leg (78.7 cm)
2.
Attach the one side frame section (7) to
the tube base segment (8) using bolts,
washers and nuts from the supplied bag
(1).
3.
Attach the second frame section (7)
to the tube base segment (8).
4.
Attach the horizontal frame section
(4). Note the positions of the centre
holes in section (4).
5.
Attach the two cross support
parts (6) between the horizontal
frame section and the side
frames.
NOTE: If the geyser will be mounted flat on a roof without the leg sections, skip to step 12.
Picture 1.2 Side frame element attached to tube base element
Picture 1.3 Side frame elements attached to tube base element
Picture 1.4 Horizontal frame element attached to frame
Picture 1.5 Cross support elements added