29
40.
Now let’s set up the throttle linkage. If you are using a DA-50 this
is very easy. You may need to rotate the carburetor on the DA-50
180 degrees so that the throttle arm is facing the bottom. Please
contact DA for the proper procedure. It is very easy and only takes
a couple of minutes. Mount the servo in the hole in the floor of the
engine box and use the 2mm pushrod and white ball links to
fabricate the throttle linkage. Very easy! If you plan to use a
tuned pipe you will need to install 3/8” hardwood servo rails on
each end of the servo hole to raise the servo so it does not touch
the header/pipe.
41.
Assemble the included Dubro 20 oz tank. Make sure to use the gas
conversion stopper and Tygon tubing for all plumbing. Use Velcro
or nylon cable ties to secure the tank to the tank tray. The tank
should butt up against the partial former in front of the wing tube.
If you look closely you can see the location of our ignition battery
and flight pack battery in this picture. (see picture next page)