84
ENGINE COVER SERVICE
LOWER COVER SERVICE
Latch Handle Installation
Apply a light coat of
Triple-Guard
grease to latch
handle shaft. Insert handle into lower cover.
Apply
Ultra-Lock
to screw threads. Place spring
washer and hook into position and tighten screw
to a torque of 180 in. lbs. (20 N·m).
Trim Switch Installation
Place switch into position through cover.
Install nut on switch. Tighten nut to a torque of 10
to 16 in. lbs. (1 to 2 N·m).
Install electrical connector. Refer to
1.
Triple-Guard
grease
006470
1.
Spring washer
2.
Hook
3.
Screw
006471
1
3
2
1
006746
006747
006748
Summary of Contents for E75DPLSCB
Page 1: ...2008 SC E TEC 75 90 P N 5007527 75 90 HP 5007527 Service Manual ...
Page 2: ......
Page 231: ...POWERHEAD POWERHEAD VIEWS 229 11 POWERHEAD VIEWS Port Short Block Starboard Short Block ...
Page 232: ...230 POWERHEAD POWERHEAD VIEWS Port Dressed Powerhead Starboard Dressed Powerhead ...
Page 233: ...POWERHEAD POWERHEAD VIEWS 231 11 Front ...
Page 234: ...232 POWERHEAD POWERHEAD VIEWS Rear ...
Page 235: ...POWERHEAD POWERHEAD VIEWS 233 11 Top ...
Page 302: ...S 2 ...
Page 349: ...2008 SC E TEC 75 90 P N 5007527 75 90 HP 5007527 Service Manual ...