
151
ELECTRICAL AND IGNITION
CONNECTOR SERVICING
7
Terminal Installation
Align terminal with connector housing and push
terminal with seal into connector housing until
seated.
Packard
†
Connectors
IMPORTANT:
Always use the appropriate
meter test probes and adapters when testing com-
ponents fitted with these terminals.
Disconnect
Lift latch(s). Remove connector.
Connect
Confirm the seal is in place. Push connector onto
housing until latched.
1.
Latch
2.
Terminal with seal
002456
1
2
Summary of Contents for E75DPLSCB
Page 1: ...2008 SC E TEC 75 90 P N 5007527 75 90 HP 5007527 Service Manual ...
Page 2: ......
Page 231: ...POWERHEAD POWERHEAD VIEWS 229 11 POWERHEAD VIEWS Port Short Block Starboard Short Block ...
Page 232: ...230 POWERHEAD POWERHEAD VIEWS Port Dressed Powerhead Starboard Dressed Powerhead ...
Page 233: ...POWERHEAD POWERHEAD VIEWS 231 11 Front ...
Page 234: ...232 POWERHEAD POWERHEAD VIEWS Rear ...
Page 235: ...POWERHEAD POWERHEAD VIEWS 233 11 Top ...
Page 302: ...S 2 ...
Page 349: ...2008 SC E TEC 75 90 P N 5007527 75 90 HP 5007527 Service Manual ...