
57
INSTALLATION AND PREDELIVERY
RUNNING CHECKS
2
Water Pump Overboard Indicator
A steady stream of water should flow from the
overboard indicator.
Operating Temperature
An outboard run at idle speed should achieve a
temperature based on the engine’s thermostatic
control. In general, the powerhead temperature
should reach at least 104°F (40°C) after five min-
utes of idling. Check that the powerhead reaches
idle temperature. Refer to
Idle Speed
Make sure the outboard idles within the specified
idle RPM range. If the outboard is run on a flush-
ing device, the idle speed and quality may not be
representative of actual in water use.
Break-In
When the outboard is delivered, refer the cus-
tomer to the break-in information in the
Opera-
tor’s Guide
.
The Engine Management Module (
EMM
) auto-
matically supplies extra oil to the engine during
the first two hours of operation, above 2000 RPM.
Use the diagnostics software to confirm that the
break-in program has been started. Refer to
1.
Water pump overboard indicator
DRC4952
1
Summary of Contents for E75DPLSCB
Page 1: ...2008 SC E TEC 75 90 P N 5007527 75 90 HP 5007527 Service Manual ...
Page 2: ......
Page 231: ...POWERHEAD POWERHEAD VIEWS 229 11 POWERHEAD VIEWS Port Short Block Starboard Short Block ...
Page 232: ...230 POWERHEAD POWERHEAD VIEWS Port Dressed Powerhead Starboard Dressed Powerhead ...
Page 233: ...POWERHEAD POWERHEAD VIEWS 231 11 Front ...
Page 234: ...232 POWERHEAD POWERHEAD VIEWS Rear ...
Page 235: ...POWERHEAD POWERHEAD VIEWS 233 11 Top ...
Page 302: ...S 2 ...
Page 349: ...2008 SC E TEC 75 90 P N 5007527 75 90 HP 5007527 Service Manual ...