background image

Main board./Automatic machine configuration 

 

VENDING MACHINE 

24 

  Temperature  display  -  option  on/off.  When  activated  the  temperature  inside  the 

machine values will be displayed. 

  Photocell 

  Calibration  -    submenu  enabling  verification  of  the  photocell  diodes  proper 

operation.    

  On 

– pressing „#” key will switch on the photocell. 

  Off- 

pressing „#” key will switch off the photocell.  

  Parameters preview. Displays the photocell calibration parameters.  

 

Tightening  on.  Pressing  „#”  key  activates  the  spring  tightening  function.  It 
involves the 

spring tightening by 30° in the case the photocell cannot detect the 

product. The tightening can be performed three times, if the photocell still cannot 
detect the product, the motor will be blocked and error xxx-004  

  will be displayed (see Chapter 2.3.6) 

 

Tightening off. Pressing „#” key deactivates the spring tightening function. 

 

Auto test on.  Pressing „#” key activates the photocell auto test function.  The 
function relates to the case when the photocell error message appears during 
calibration  (the  machine  is  out  of  order).    The  auto  test  is  the  automatical 
verification if the photocell is still unable to perform the proper calibration. If the 
calibration is performed properly, the automatic vending machine will restart  the 
regular sell. 

  Auto test off. 

Pressing „#” key will deactivate the auto test function.   

  Language.  Enables  the  language  change.  Polish  and  English  languages  can  be 

selected.   

  Energy  saving 

–  it  is  possible to set  the  time,  after  which the machine  lighting  will 

operate with 50% of intensity. 

  Automatic  machine  number.  The  main  board  has  a  unique  number  assigned  for 

identification purposes.   

  Service  auto-reset.  Enables  the  time  setting,  after  which  the  service  mode  (idle 

condition) will be returned to the sell mode. 

  Factory  settings.  Activation  will  result  in  the  machine  return  to  the  factory  settings. 

The “

Factory settings restored

” message will be displayed.  It will cause the deletion of 

statistics, prices for the positions and return to the standard coin inlet  settings. For 
restart of the motors the 

Motor auto-test

 should be performed.    

 

2.3.4. Payment settings 

 

For that menu the following options can be selected („#” key): 

  Coin intake settings. On/off options.  

  On 

  Off 

  Tube supplementation. The function enables the coin intake supplementation 

with the coins.  

  Banknotes accepter settings. On/off options. 

  Maximal debt. The function enables setting of  the maximal face value accepted by the 

machine for purchase performance .(0- unidentified). 

  Maximal change. The function enables setting of the maximal change value, given by 

the machine after purchase performance. (0- unidentified). 

Example: 
The operator sets the maximal change at 3,80 PLN for example. The customer inserts 10 PLN 
and purchases a products for 1,20 PLN. The debt value is 8,80 PLN at present, but he cannot 
receipt the change 

– he must purchase further products until the debt will be less or equal to 

the set value of 3,80 PLN. This helps to avoid money-changing in the machine. 

 
 

Summary of Contents for SOLID AS 6x10

Page 1: ...EBA Sp z o o ul Popiełuszki 86 38 401 Krosno PL evend evend com pl www evend com pl tel 48 13 436 19 61 Service Manual Spring Operated Automatic Vending Machine SOLID AS 6x6 AS 6x8 AS 6x10 AS 6x12 ...

Page 2: ......

Page 3: ...d of Polish vending machines produced by EBA Sp z o o a company with long tradition of industrial production strong position on the Polish and international market and a company that promotes the development and innovative technology ...

Page 4: ...ns on a good choice This service manual allows you to become familiarized with the operation start up and proper maintenance of the machine The information contained concerns particular functions and a method of their use You should carefully read the following recommendations and warnings before starting installation ...

Page 5: ...VENDING MACHINE ...

Page 6: ...VENDING MACHINE ...

Page 7: ...machine configuration 19 2 1 Main board 19 2 2 1 Main board components 19 2 2 2 Main board connector with pin description 20 2 3 Main board menu 21 2 3 1 Prices 22 2 3 2 Statistics 23 2 3 3 Automatic machine setting 23 2 3 5 Accessories 25 2 3 6 Communication 26 2 3 7 Test 27 2 3 8 Failures 28 3 Refrigerating unit 29 3 1 Refrigerating unit construction 29 3 2 Refrigerating unit disassembly procedu...

Page 8: ...VENDING MACHINE 6 ...

Page 9: ...ing and modification of the automatic machine performance Fig 1 Spring operated automatic machine AS6x8 with parameters 1 2 Specifications AS6x6 AS6x8 AS6x10 AS 6x12 Height 1840mm 1840mm 1840mm 1840mm Width 737mm 885mm 1032mm 1185mm Depth with doors opened 890mm 1430mm 890mm 1580mm 890mm 1727mm 890mm 1865mm Weight 290 kg 320 kg 350 kg 390 kg Supply 230 V 230 V 230 V 230 V Frequency 50 Hz 50 Hz 50 ...

Page 10: ...sm setting 7 Proximity card reader RFID 8 Lock used to open and close main doors and control panel 9 Coin return receipt of a change and not accepted coins 10 Product collection pocket receipt of the purchased goods 11 Front grill Fig 2 External structure of automatic machine 1 4 Internal structure of automatic machine 1 Spring operated drawers used for storage and sell of products 2 Product numbe...

Page 11: ... machine must not be installed near intensive heat sources or water sprinklers Before the installation make sure that the front glass is not subject to a direct effect of the sun s rays The machine operates properly in the temperature range from 9 C to 26 C and the humidity not exceeding 60 In order to ensure a proper circulation areas of air change shall be left free front and back of the machine...

Page 12: ...k Before making the electricity connection we need to ensure that the socket the machine will be connected to meets the standard requirements as well as verify the grounding integrity An annual verification is strictly recommended The supply connections inside the machine shall not be modified Supply indications Brown Phase Blue Neutral Green yellow Protective Power consumption The measurement was...

Page 13: ...Information VENDING MACHINE 11 Fig 7 Block diagram of the automatic machine supply ...

Page 14: ...ter switch refrigerating unit switch R10A 250V fuses 2 pieces R2A 1 piece Fig 8 Electric box view 1 7 Display The machine is equipped with the graphical display WC2002A protected by the scratch resistant screen The display enables performing all determination and selection operations by the user the product selection number of coins inserted into the machine information on the purchase status info...

Page 15: ...itate filling with the goods Before the goods insertion the springs should be verified for a proper selection for a given product Softer packagings should refill the lower drawers Fig 10 The drawer configured for 8 springs Fig 11 The drawer configured for 4 double springs The drawer dismantlement 1 Lift and carefully pull to the stopping point 2 Disconnect the motor connection cable ...

Page 16: ...assembly of the engines respectively For the flat products and cans the additional slides facilitate sliding of the product For performing the adjustment of the spring position the slide should be unscrewed at first The failure to observe these rules can result in damage of the slide or the slide mounting 1 9 Springs The machine is equipped with the steel springs galvanic coated for corrosion prot...

Page 17: ...Information VENDING MACHINE 15 Fig 12 Spring types ...

Page 18: ...t drawer equipped with four motors the remaining five drawers with eight motors each SOLID 10 55 motors the first drawer equipped with five motors the remaining five drawers with ten motors each SOLID 12 66 motors the first drawer equipped with five motors the remaining five drawers with ten motors each The motors are used to rotate the springs Supplied with 24 V DC Fig 13 The back wall of the dra...

Page 19: ...ction 1 4 by unscrewing the 4 nuts and then screwing frame PD Fig 14 Fig 14 Frame PD 1 12 Maintenance and cleaning operations Hygiene All elements are high quality powder coated This facilitates cleanness maintenance inside of the machine Clean with a damp cloth The producer shall not be liable for any defects resulting from cleaning with the aggressive chemical agents The refrigerating unit filte...

Page 20: ...nal equipment includes the following Sense Talk Speaking system The system acts on a principle of move detection When the device detects a person presence movement near the machine the sensor will enable a music box and previously recorded sequence of sounds will be played The music box operating manual is supplied together with the machine Hotspot WLAN Two router set can be installed in the machi...

Page 21: ...are update is performed via PC computer The board features the RS232 port for communication 1 WIRE and I2 C bus 2 2 1 Main board components The following components are connected to the main board Fig 15 Fig 15 Main board Motors with position signalization systems the so called limits up to 80 motors Matrix keyboard LCD 2x20 display Photocell MDB payment system coin intake banknotes accepter no ca...

Page 22: ... B9 SYGN Doors C9 5V Photocell A10 GND MDB interface B10 RX MDB interface C10 TX MDB interface A11 27V MDB interface B11 GND MDB interface C11 PK0 Matrix keyboard A12 PK1 Matrix keyboard B12 PK2 Matrix keyboard C12 PK3 Matrix keyboard A13 PK4 Matrix keyboard B13 PK5 Matrix keyboard C13 PK6 Matrix keyboard A14 PK7 Matrix keyboard B14 5V Graphical display C14 LED Graphical display A15 VEE Graphical ...

Page 23: ... GND Power supply C31 GND Power supply A32 27V Power supply B32 27V Power supply C32 27V Power supply 2 3 Main board menu Entry to the main menu after pressing the service button on the main board Entering all the submenu groups is possible on that level Operating of the menu is preformed via the keyboard by an appropriate key selection Fig 19 Main menu view used to move right on the same menu lev...

Page 24: ... setting for the following is possible position shelf whole automatic machine hours with discount After pressing key entering submenu for the time range when the products are sold at the promotional price is possible Free of charge sell Ater pressing key entering submenu for the free of charge sell activation deactivation is possible Example To add a given position price the main menu should be en...

Page 25: ...cting the given position number the number of products sold for the position can be previewed For position amount after entering and selecting the given position number the total amount value of products sold for the position can be previewed Number of products sold displays the total number of products sold When the machine is equipped with the number and prices of products displays the number of...

Page 26: ...anguages can be selected Energy saving it is possible to set the time after which the machine lighting will operate with 50 of intensity Automatic machine number The main board has a unique number assigned for identification purposes Service auto reset Enables the time setting after which the service mode idle condition will be returned to the sell mode Factory settings Activation will result in t...

Page 27: ...ty period Inactivity period Color of activity The lighting color selection for the machine operation in the active mode Color of inactivity The lighting color selection for the machine operation in the inactive mode Welcome message The message selection to be played after the motion detection active mode on Thanks message The message selection to be played after the automatic vending machine purch...

Page 28: ...essed and the number of the device to operate should be selected device number can be changed with 1 2 keys If you do not want to select any smell to be sprayed for the particular drawer the cancel key should be pressed The access to the next drawer will be performed automatically Drawer 1 Smell 1 2 3 the smell selection for no 1 drawer Drawer 2 Smell 1 2 3 the smell selection for no 2 drawer Draw...

Page 29: ...f the test is turning the motor until a signal reception from a limit switch After receiving the signal the motor will be stopped and OK message will be displayed When the signal is not received the motor will be stopped after previously defined period In case of motor lack or shortcut the test is ceased immediately That case is signaled with NOK message Motor auto test Enables the automatic test ...

Page 30: ...rmed The test for the proper motor will be performed which is necessary for the proper performance of the error list deletion Error codes 001 xxx coin intake errors 002 xxx acceptor errors 008 xxx photocell errors 008 001 excess over min and max values for the photocells calibration test errors switch off and switch on the machine 010 xxx do 080 xxx motor errors the digit before the hyphen indicat...

Page 31: ...sor defrosting sensor Fig 20 Refrigerating unit with components view 3 2 Refrigerating unit disassembly procedure 1 Disconnect the automatic machine power supply 2 Open the main machine doors 3 Pull up the pin and disassemble the masking frame 4 Unscrew the fixing screw and disassemble two chute guides placed on the machine side walls 5 Unscrew four fixing screws and disassemble the product recive...

Page 32: ...ating unit VENDING MACHINE 30 Fig 21 Refrigerating unit block disassembly CAUTION All of the assembly and disassembly operations shall be performed by the qualified personnel with the power supply disconnected ...

Page 33: ...navigating between parameter presets When setting parameters value it increases parameter value SET MUTE During normal operation of the controller it disables the acoustic alarm signal pressing for over 1 second shows the preset point Pressing for over 3 seconds causes the parameter settings menu to display In parameter setting mode pressing the button changes the information displayed on the scre...

Page 34: ... Defrosting sensor connects to terminal 9 10 Controller sensor and defrosting sensor are of the same type Dimensions of the enclosure behind the assembly panel with the side catches attached and the screw terminals removed width 82 mm height 37 mm depth 80 mm Fig 22 Electrical diagram of controller 3 3 3 Functions of controller Function Function description Programming temperature preset In order ...

Page 35: ...rol activities shall be performed Condenser cleanness verification Presence of ice in evaporator verification Drainage hose for defrosted water permeability verification Fans operation verification In continuous humidity conditions the leakages can appear under the refrigerating unit Additional container should be installed in that case With high humidity of the air above 60 the glaze retting is n...

Page 36: ...posal enables valuable resources conservation and avoids adverse effects on health and environment which can be compromised through mismanagement of wastes The spring operated automatic machine shall be recycled together with packaging Illegal disposal is liable to criminal penalties EU countries Equipment marked with this symbol shall not be disposed together with municipal wastes For more inform...

Page 37: ...s does not exclude limit or suspend the Buyer rights resulting from the product nonconformity with the contract 7 The Warranty Card is the only document on the basis of which the entitled to the warranty can enforce his warranty rights on Polish territory The warranty shall prevail any other warranties which may be included in other documents attached to the product sold Warranty processes 1 After...

Page 38: ...manual particularly from improper use maintenance service and storage the defects resulting from the incorrect electrical installation on the user side flooding components with water the mechanical damages and the defects resulting from that damages the defects and damages attributed to force majeure e g lightning flood corrosion power line surges the defects resulting from the unauthorized repair...

Page 39: ...ective goods 5 When and under which circumstances the defect was noticed by the customer 6 Whether and if so how long was the product used after the defect detection 7 Claimant expectations acc Art 8 1 of Law dated 27 June 2002 I agree with the abovementioned terms Customer signature COMPLETED BY THE SELLER 1 Date of purchase 2 Symbol 3 Product name 4 Purchase price 5 Proof of sale no 6 Date of co...

Page 40: ...G MACHINE 38 WARRANTY DOCUMENT Completed by the seller Serial number Product name Date of sell Catalog number Proof of purchase number Repair record Date of accept Date of repair Scope of repair Service seal signature ...

Page 41: ...d without prior authorization from Producer exclusive copyright owner The producer reserves the right to modify characteristics of the machine described in the operation manual without prior notification and assumes no responsibility for any error in this document resulting from printing and typing errors ...