Instalation of a Kids Tramp 1,50 m – with concrete bedding
Instalation of a Kids Tramp 1,50 m – with concrete bedding
existing ground
existing ground
existing ground
31
washed gravel
16 / 32 mm
30
12
40
6
16
40
6
16
lean concrete
lean concrete
20
20
61
free space beneath jumping bed centre
possible sag
concrete L -
shape blocks
concrete L -
shape blocks
air space
160 cm
150 cm
5
Slope angle depending
on the soil quality
Slope angle depending
on the soil quality
5
grit 2 – 5 mm
grit 2 – 5 mm
160 cm
150 cm
150 cm
150 cm
5
5
160 cm
150 cm
5
5
min 394 cm / Loop: min Ø 393
washed gravel 16 / 32 mm
concrete L bloc
ks
concrete L bloc
ks
concrete L blocks
concrete L blocks
grit 2 – 5 mm
grit 2 – 5 mm
grit 2 – 5 mm
grit 2 – 5 mm
safety area
(from end of jumping bed)
safety area
(from end of jumping bed)
Preparing a square pit
•
Dimensions: 160 cm x 160 cm
•
Depth: 73 cm
•
On cohesive soil, a vertical recess should be possible in a
short time. On non-cohesive or loose soils, an angle of
slope should be maintained to prevent subsequent slipping
of the edges.
Profile diagram
Required material
•
0,40 m
3
lean concrete
•
8x 40/40/22 cm concrete L blocks, mitre cut
•
8x 40/40/22 cm concrete L blocks
•
0,05 m
3
washed gravel 16 – 32 mm
•
0,10 m
3
grit 2 – 5 mm
Pit preparation
•
Place concrete L blocks with external dimensions
measuring 150 x 150 cm on a lean concrete in the pit. The
top edge of the concrete L blocks should be 31 cm below
the ground level.
•
After installing the concrete support, fill the gap between
the concrete L blocks with washed gravel (16/32 mm) to a
depth of 12 cm.
•
Once preparations are complete, the Kids Tramp can be
placed on the concrete L blocks. Fill the remaining cavities
between the equipment and the existing ground with 2 – 5
mm grit.
•
Add humus to the top 5 – 10 cm to create a seamless
transition to the existing ground.
•
Drainage must be added to cohesive (impermeable) soil.
The pit must be dug 15 cm deeper and a drainage pipe
fitted which can be connected to an appropriate outflow
(e.g. sewerage system).
•
Then compact 15 cm of frost protection and and base
layer/gravel mix across the entire surface and then apply
the concrete layer.
Attenttion:
the Kids Tramp must be installed on a level
surface and not on a mound or slope.
Floor plan / top view
Suitable Kids Tramp models
•
Art. 97100: Kids Tramp “Kindergarten“
•
Art. 97110: Kids Tramp “Kindergarten Loop“
•
Art. 97000: Kids Tramp “Playground“
•
Art. 97010: Kids Tramp “Playground Loop“
•
Art. 97100B: Kids Tramp “Playground“
+ special coating
•
Art. 97010B: Kids Tramp “Playground Loop“
+ special coating
Installation of a Kids Tramp 1,50 m — with concrete bedding