background image

www.etsnord.com

8

®

RDM-31-0222

NORD

canopy

  

 

|

   

OZ 3.0 Installation Guide

4.3  Mount the Control Panel

Choose a visible and easily accessible location in the kitchen suitable for the Control Panel. Avoid positioning 

it near any sources of moisture or heat.

The housing must be disassembled into three parts.
Remove the two fixing screws on the sides of the case.

Before mounting the backplate apply an even strip of waterproof silicone along the rear of the backplate as 

pictured below.

Fasten the back plate to the wall with its cable cutout facing downward, preferably at eye level but not higher 

than 180 cm from the floor.

 

Summary of Contents for NORDcanopy OZ 3.0

Page 1: ...NORDcanopy OZ 3 0 Ozone Cleaning System Installation Guide...

Page 2: ...odules 5 3 1 Set the device addresses 5 4 Installation 6 4 1 General information 6 4 2 Connect the pressure measurement hoses 7 4 3 Mount the Control Panel 8 5 Electrical Installation 9 5 1 Connect th...

Page 3: ...t generates ozone O3 Ozone significantly reduces odor grease mold and bacteria ETS NORD AS disclaims any liability in the case that the product is not used in accordance with the manufacturer s instru...

Page 4: ...f Ozone Modules is dependent on the design of the kitchen and the canopy as well as the equipment used for cooking This is decided when planning the kitchen 2 System overview The Ozone Modules produce...

Page 5: ...r intake grid The address is set using the switches marked 1x and 10x The 1x switch is positioned nearest the corner of the circuit board Example Ozone Module one Adress 1 Switch 1x 1 Switch 10x 0 Ozo...

Page 6: ...facturer s drawings The ozone duct must be made of acid resistant stainless steel AISI 316 Before starting the Ozone Module check visually that all ozone duct connections are airtight Always leave a m...

Page 7: ...dule into place securely attach one end of the hose to the hose located in the Ozone Module 100mm flange Raise the module into place gently pulling the hose from its other end to ensure it does not be...

Page 8: ...it near any sources of moisture or heat The housing must be disassembled into three parts Remove the two fixing screws on the sides of the case Before mounting the backplate apply an even strip of wa...

Page 9: ...alarm panel may be connected a single 10A C type slow circuit breaker NOTE Electrical installation must be performed by an authorized electrician and follow local regional and national standards and...

Page 10: ...sed on each generator as would normally be done for external appliances Control Panel power cables may be fed through either the rear wall or the cable bushings in the bottom of the case Connect the 2...

Page 11: ...ntrol Panels in larger facilities Cable bushings come preattached inside the supply chambers 3x0 25 mm2 or another shielded data cable with at least 3 conductors Data terminal A B and C GND are connec...

Page 12: ...and mark the other ends of the wires within the junction box with their corresponding terminal assignments Rout the other end to a junction box that is situated near or on top to the canopy Control Pa...

Page 13: ...LAN cable straight to the port on the board as seen below LAN cable must be connected to a network switch or to the closest LAN socket Reassemble the housing in reverse order with the smaller LED dis...

Page 14: ...the device has been performed by an authorized partner of ETS NORD AS the equipment is serviced every 12 months after commissioning specified components eg ozone generating equipment have been replace...

Page 15: ...etsnord ee ETS NORD Finland Address Pakkasraitti 4 04360 Tuusula Finland Phone 358 401 842 842 info etsnord fi www etsnord fi ETS NORD Sweden Address J rsj gatan 7 69235 Kumla Sweden Phone 46 70 780...

Reviews: