www.etsnord.com
12
®
RDM-31-0222
NORD
canopy
|
OZ 3.0 Installation Guide
Next, install the I/O data cable for your building automation system or for future upgrades.
Connect the five (5) terminals DI1, DI2, DO1, DO2 and COM+ and mark the other
ends of the wires within the
junction box with their corresponding terminal assignments
.
Rout the other end to a junction box that is situated near or on top
to the canopy.
Control Panel
PLC / Building automation
Junction box
I/O cable
DI2
DI1
COM+
DO2
DO1
For more technical information, please read the ”OZ 3.0 Ozone Cleaning System Automation Guide”
or contact your ETS NORD representative.
PLC
I/O