21
Horizontal Termination
Side Wall (Direct Vent)
Side Wall (Concentric Vent)
Side Wall (Power Vent)
□
□
□
Below diagrams are examples of horizontal terminations.
Once the vent terminal location has been determined, make a hole through the exterior wall to accommodate the
vent pipe. Vent pipe must only exit exterior wall horizontally.
Place the
3" metal mesh screen inside the terminal
tting and connect it as shown to the vent pipe on the
exterior of the building.
Seal any opening around the vent pipe or
ttings with mortar or silicone caulk "silicone caulk, as show above."
Complete the rest of the vent pipe installation to the water heater's vent connector
tting on the blower outlet.
If necessary, support horizontal run as previously mentioned.
□
□
□
□
WARNING
!
!
The Grand Hall approved concentric kit is a unique
pipe-in-pipe venting system designed for termination.
Do not try to replicate or make your own. For more
information, please refer to
Concentric Vent Kit
section in the Operation manual.
WARNING
!
!
An open tee is recommended to use as a
termination to alleviate and prevent back
pressure in the venting system.
For optimal results, the open tee should be
positioned vertically.
Summary of Contents for GU125T
Page 3: ...3 Included Accessories Optional Accessories...
Page 5: ...5 Dimensions GU125T 518 11 12 1125 GU160T 518 11 12 1160...
Page 6: ...6 Dimensions GU125T 518 11 12 1125 GU160T 518 11 12 1160...
Page 7: ...7 Dimensions GU125T 518 11 12 1125 GU160T 518 11 12 1160...