Installation
19
4:
Install the mounting hardware. See
. Leave approximately
2.5 cm (1 in) of threads exposed for ease of mounting the panel.
5:
Temporarily mount the panel with the installed mounting hardware.
6:
With the panel installed (temporarily), mark the required conduit entry locations. See
7:
Remove the panel from the mounting hardware and cut the conduit entry into the panel.
8:
Re-attach the panel to the mounting hardware and install any remaining mounting hardware.
There are six or eight sets total, depending on your panel.
9:
Tighten the mounting bolts securely.
10:
Attach and tighten the conduit to the enclosure.
Install Main Circuit Breaker (Optional)
The Sensor IQ Breaker Panel ships with main lugs. ETC offers Main Circuit Breaker Option Kits for field
installation, if required.
See the Main Circuit Breaker Kits table under
Refer to the installation instructions provided with the main circuit breaker kit ordered.
Install Main Fuse Kit (Optional)
The Sensor IQ Breaker Panel ships with main lugs. ETC offers a Main Fuse Kit for field installation, if
required.
Refer to the installation instructions provided with the main fuse kit ordered. Main feed termination
instructions are outlined below.
Install Breakers
Breakers are field installable and no additional tools are required.
1:
Peel off the protective film that covers the control contacts in the areas where you will install
breakers.
2:
Position the breaker with the handle pointed towards you and the wire termination points facing
the outside wall of the panel.
3:
Hook the outer corner of the breaker under the breaker clip located on the edge of the breaker
interior.
4:
Pivot the breaker into place until the inner edge snaps onto the bus bar.
Note:
When punching holes for conduit, keep in mind that the low-voltage trough runs
through the chimney between the controller and the edge of the panel.