46
www.eta.co.at
Dismantling the boiler (if required)
Installation
Detaching the pellet hopper
On both sides of the pellet hopper, remove the two
M8 screws. Loosen the 4 screws for fastening to the
stoker and remove the pellet hopper.
Fig. 9-23: Pellet hopper
Make sure care that the seal between the pellet
hopper and the stoker is not damaged.
Remove stoker
Loosen the 4 M8 screws fastening the stoker to the
boiler. Then take the stoker out of the boiler.
Fig. 9-24: Stoker
Avoid damaging the seal between the boiler and
the stoker.
Fig. 9-25: Seal
Placing the boiler
Remove the extension frame from the bottom.
Fig. 9-26: Frame
Place the boiler body into the boiler room.
Summary of Contents for PelletsCompact PC33
Page 1: ...2020 07 21 EN 0000000171 V 025 2707 93113 005 PelletsCompact 33 50 kW Installation...
Page 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33...
Page 51: ...Installation Network connection 51...
Page 55: ...Electrical connections Overview of circuit boards 55...
Page 74: ...www eta co at...
Page 75: ......
Page 76: ...www eta co at www eta co at downloads DOWNLOAD...