42
www.eta.co.at
Dismantling the boiler (if required)
Installation
The boiler's circuit boards are located behind it.
Fig. 9-8: Circuit boards
9.3
Dismantling the boiler (if
required)
The boiler can be dismantled for placement
The boiler can be dismantled if the spatial conditions
require it. Only in that case are the following steps
necessary. Approx. 2 hours are needed for the
dismantling and subsequent reassembly.
If the boiler is not dismantled, assembly
continues with step
Removing the internal cover
Remove the cover behind the boiler door.
Fig. 9-9: Cover
Removing the cover from the front
Remove the cover from the front of the boiler.
Fig. 9-10: Cover
Removing the cover above the pellet hopper
Remove the cover above the boiler's pellet hopper.
Fig. 9-11: Cover
Summary of Contents for PelletsCompact PC33
Page 1: ...2020 07 21 EN 0000000171 V 025 2707 93113 005 PelletsCompact 33 50 kW Installation...
Page 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33...
Page 51: ...Installation Network connection 51...
Page 55: ...Electrical connections Overview of circuit boards 55...
Page 74: ...www eta co at...
Page 75: ......
Page 76: ...www eta co at www eta co at downloads DOWNLOAD...