Installation
Dismantling the boiler (if required)
45
Loosen the screws on the bottom of the frame and
completely remove the frame. Make sure that no
cables are damaged while doing this.
Fig. 9-19: Frame
Disconnecting the power supply from the stoker
drive and the vacuum turbine
Disconnect the power supply cables for the stoker
drive and the vacuum turbine.
Fig. 9-20: Stoker drive
Fig. 9-21: Vacuum turbine
Unplugging the fill level sensor
Disconnect the cable for the fill level sensor from the
circuit board [PE-C] at terminal [S528]. Unthread the
cable from the cable ducts and fasten it to the pellet
hopper.
Fig. 9-22: Fill level sensor
Summary of Contents for PelletsCompact PC33
Page 1: ...2020 07 21 EN 0000000171 V 025 2707 93113 005 PelletsCompact 33 50 kW Installation...
Page 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33...
Page 51: ...Installation Network connection 51...
Page 55: ...Electrical connections Overview of circuit boards 55...
Page 74: ...www eta co at...
Page 75: ......
Page 76: ...www eta co at www eta co at downloads DOWNLOAD...