background image

2017-08-23
EN
0000000360
V.003
X.35.6, X.40.1

939016-002

Replacing the control panel on

the BE-P3

Installation

Summary of Contents for BE-P3

Page 1: ...2017 08 23 EN 0000000360 V 003 X 35 6 X 40 1 939016 002 Replacing the control panel on the BE P3 Installation...

Page 2: ...ETA Heiztechnik Gewerbepark 1 A 4716 Hofkirchen an der Trattnach Tel 43 0 7734 22 88 0 Fax 43 0 7734 22 88 22 info eta co at www eta co at...

Page 3: ...12 3 4 Exchanging a BE P3 14 4 Concluding activities 15 4 1 Setting node numbers 15 4 1 1 Up to software version X 35 X 15 4 1 2 Software version X 36 0 and later 15 4 2 ETAtouch software update 16 4...

Page 4: ...ors or changes of any kind made in the interim are not cause for claims Individual configurations depicted or described here are only available optionally In the event of contradictions between indivi...

Page 5: ...and 3 XX X for BE P3 As a precaution you can also download all software versions for the user interface up to X 35 X 1 35 X 2 35 X and 3 35 X and the versions from X 36 0 e g 2 39 0 and 3 39 0 You ca...

Page 6: ...BE P2 the node number is only displayed in the ETAtouch control system Depending on the software version installed up to X 35 X or from X 36 0 the set node numbers are displayed differently Up to soft...

Page 7: ...xchange for PelletsUnit PelletsCompact Technical illustrations The following describes how to exchange the control panel of the PelletsUnit boiler and is also applicable to the PelletsCompact boiler D...

Page 8: ...on top Fig 3 5 Attachment Plug the supplied USB cable angled plug and socket to the side of the control panel and attach the socket to the frame Fig 3 6 USB cable Connect the USB adapter cable part o...

Page 9: ...ctive control panel Remove the cover plate on the inside of the insulation door Fig 3 8 Cover plate Remove the four screws on the side and carefully take the cover with the control panel out of the to...

Page 10: ...mplate Fig 3 13 Side view with enlarged cut out Fig 3 14 Cutting template After cutting out seal the cut edges with a coating to prevent rust from building up Mount new control panel The two side tabs...

Page 11: ...the existing boiler USB cable If a network cable was previously connected also connect it to the control panel Fig 3 19 USB adapter cable Attach the USB cable from the boiler to the door frame with a...

Page 12: ...e the defective control panel Fig 3 22 Control panel Enlarge cut out for the new control panel if desired The new control panel protrudes slightly due to the existing cut out in the cover See the foll...

Page 13: ...the cover has not been enlarged Fig 3 26 Break off tabs Insert the new control panel and carefully attach it with the retaining plate and two screws Note the correct alignment of the control panel The...

Page 14: ...the frame to the panels 3 4 Exchanging a BE P3 Replacing the BE P3 control panel The BE P3 control panel is replaced by a new BE P3 in the same way as described in the previous chapters However only...

Page 15: ...System configuration A window with the system settings appears 6 Press the Change button next to CAN node switch A window appears where you can enter the desired node number The values 0 to 7 are perm...

Page 16: ...he ETAtouch control panel of the boiler itself and on all further ETAtouch control panels 1 Plug the USB memory stick with the files for the software update into the ETAtouch control panel 2 Press the...

Page 17: ...ars to remove the USB memory stick After removing the USB memory stick the ETAtouch control panel will restart automatically The software update was successfully installed and completed when the symbo...

Page 18: ...18 www eta co at Cutting template 5 Cutting template Cutting template for BE P3 The cutting template is depicted at 1 1 scale...

Page 19: ......

Page 20: ...www eta co at www eta co at downloads DOWNLOAD...

Reviews: