![eta 11120L Installation Manual Download Page 13](http://html1.mh-extra.com/html/eta/11120l/11120l_installation-manual_2430201013.webp)
Installation
Adjusting the log boiler
13
4
Installation
Assembly and installation only by qualified
specialist personnel
The assembly and installation may be performed
by specialist personnel with the corresponding
qualifications only.
Technical illustrations
The technical illustrations in this documentation show
a log boiler with the pellet burner on the left side. The
illustrations apply equally for a log boiler with the pellet
burner on the right side.
Check space requirement
The pellet burner is available for installation on the left
or right side of the log boiler. If the log boiler is already
installed, the space required by the pellet burner in the
boiler room must be checked before installation. For
more information, see chapter
4.1
Adjusting the log boiler
Removing the cleaning lever
Remove the panel next to the flue gas connection.
Fig. 4-1: Panel
Remove the insulation over the heat exchanger cover.
Fig. 4-2: Insulation
Loosen the knurled nuts on the heat exchanger cover
by turning it anti-clockwise and rotate the ball knobs by
180°.
Fig. 4-3: Knurled nut and ball knob