51
12-4
Replacement of the LCD harness, the main control board ASSY,
the LCD, the LCD harness, the operation board switch ASSY, the
operation switch harness, LCD cover unit
1)
Remove the main unit cover L and R (refer to 12-1).
2)
Unscrew 4 fixing screws of the LCD cover ASSY, remove 2 harnesses that are connected
to, and remove the harness fixing ramp.
LCD cover ASSY
Fixing screws
LCD cover
fixing screws
Sheet metal
fixing screws
3)
Unscrew 4 LCD cover fixing screws and 4 sheet metal fixing screws and remove the LCD cover.
Harness 2
Fixing screw 1
Fixing screw 2
Fixing screw 3
Main control board
Harness 1 (LCD harness)
LCD base
Harness 3
(Operation switch harness)
Fixing screw 4
Operation
switch
board
4)
Replace the LCD harness after removing the harness 1.
5)
Replace the main control board ASSY after removing the harness 1,2, and 3 and 4 fixing
screw 3.
6)
Replace the LCD after removing harness 1, 2, and 3 and 4 fixing screws 1 and 2.
7)
Replace the operation switch board ASSY after removing harness 3, 4 fixing screws 1,
and
3 fixing screws 4.
8)
Replace the operation switch harness after removing the LCD switch board ASSY in
manner of 7) above.
9)
Replace the LCD cover unit after removing the LCD base and the operation switch board
ASSY in matter of 7) above.
Summary of Contents for AKR 750
Page 1: ...Auto kerato refractometer Maintenance Manual V1 09 2016 ...
Page 6: ...4 Block Diagram ...
Page 7: ......
Page 8: ...8 ...
Page 66: ...65 ...