12
STEP 3 - OPEN CRATE
STEP 4 - ASSEMBLE MAIN FLOOR PANELS
Open all crates
and cartons
in the numbered
sequence, which
indicates the order of
panel construction.
To prevent damage to
panels, remove panels
from the crates or
cartons only as they
are needed.
In numbered
order, place
the main floor panels
on the marks made in
step 2.
To remove a panel,
loosen the crate lumber
or disassemble the
crate. Do not force the
panel from the crate if it
becomes jammed.