After
you
finish
__
Did
you
receive
a
cable
hook
with
your
rack
shipment?
v
No.
Continue
to
the
next
task.
v
Yes.
The
cable
hook
manages
the
server
cables
in
the
back
of
the
rack.
To
install
the
cable
hook,
slide
it
into
the
slots
that
are
located
on
the
back
of
the
rack
as
shown
here:
Cabling
the
server
to
access
the
Integrated
Virtualization
Manager
Learn
how
to
access
the
Integrated
Virtualization
Manager,
connect
external
cables
and
power
cords,
route
the
cables,
and
attach
devices
after
you
install
all
of
your
hardware
features
or
replace
parts.
Chapter
3.
Installing
an
03E/4A
with
logical
partitions
49
Summary of Contents for PL160R
Page 1: ...PL160T R PL260T T and PL460T R Installation Guide ESCALA REFERENCE 86 A1 55EW 01...
Page 2: ......
Page 10: ...viii Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 12: ...2 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 14: ...4 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 54: ...44 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 96: ...86 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 98: ...88 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 105: ......
Page 106: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 55EW 01...