Contents
Safety
notices
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. v
About
this
publication
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. vii
How
to
send
your
comments
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. vii
Installing
the
model
03E/4A
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 1
Chapter
1.
Prerequisite
tasks
for
the
03E/4A
installation
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 3
Chapter
2.
Installing
your
system
in
a
rack
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 5
Installing
the
rack
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 5
Rack
safety
notices
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 5
Determining
the
location
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 7
Marking
location
by
using
the
rack-mounting
template
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 8
Marking
the
location
without
a
rack-mounting
template
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 10
Installing
the
14T/00,
14T/42
racks
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 11
Completing
a
parts
inventory
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 11
Positioning
the
rack
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 11
Leveling
the
rack
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 12
Attaching
the
stabilizer
brackets
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 13
Attaching
the
rack
to
a
concrete
floor
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 14
Attaching
the
rack
doors
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 19
Connecting
multiple
racks
with
rack-to-rack
attachment
kit
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 21
Attaching
the
rack
to
the
concrete
floor
beneath
a
raised
floor
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 23
Connecting
the
power
distribution
system
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 27
Power
distribution
unit
plus
(PDU+)
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 27
Checking
the
ac
outlets
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 27
Attaching
the
front
or
back
ac
electrical
outlet
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 28
Installing
the
ac
outlet-mounting
plates
with
ac
outlets
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 28
Installing
the
ac
outlet-mounting
plate
without
ac
outlets
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 30
Connecting
a
dc
power
source
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 31
Installing
the
rack
security
kit
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 35
Installing
the
model
in
a
rack
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 38
Attaching
the
mounting
hardware
to
the
rack
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 40
Installing
the
cable-management
arm
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 43
Chapter
3.
Installing
an
03E/4A
with
logical
partitions
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 45
Checklist:
Installing
an
03E/4A
with
logical
partitions
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 45
Cabling
your
server
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 45
Cabling
the
server
and
the
Hardware
Management
Console
(HMC)
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 46
Cabling
the
server
to
access
the
Integrated
Virtualization
Manager
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 49
Cabling
the
server
to
access
the
Operations
Console
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 53
Setting
up
your
console
or
interface
and
create
logical
partitions
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 58
Setting
up
the
HMC
and
create
logical
partitions
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 58
Setting
up
Virtual
I/O
Server,
IVM,
and
logical
partitions
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 59
Setting
up
the
Operations
Console,
twinaxial
console,
or
5250
console
and
creating
logical
partitions
.
.
.
. 59
Setting
up
your
server
to
connect
to
service
and
support
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 60
Installing
operating
systems
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 60
Obtaining
updates
and
upgrades
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 60
Chapter
4.
Installing
a
model
03E/4A
without
logical
partitions
.
.
.
.
.
.
.
.
.
.
.
. 61
Checklist:
Installing
an
03E/4A
without
logical
partitions
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 61
Cabling
your
server
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 61
Cabling
the
server
and
the
Hardware
Management
Console
(HMC)
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 62
iii
Summary of Contents for PL160R
Page 1: ...PL160T R PL260T T and PL460T R Installation Guide ESCALA REFERENCE 86 A1 55EW 01...
Page 2: ......
Page 10: ...viii Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 12: ...2 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 14: ...4 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 54: ...44 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 96: ...86 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 98: ...88 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 105: ......
Page 106: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 55EW 01...