correctly
located,
remove
the
lower
plastic
isolator
bushings.
1
Rack
chassis
7
Jam
nut
2
Rack-mounting
bolt
8
Leveling
foot
3
Thin
washer
9
Lower
plastic
isolator
bushing
(used
only
on
dc
powered
systems)
4
Top
plastic
isolator
bushing
AC
Typical
leveling
foot
installation
for
an
ac-powered
rack
5
Thick
washer
DC
Typical
leveling
foot
installation
for
an
dc-powered
rack
6
Spacer
6.
Position
the
two
mounting
plates
in
the
approximate
mounting
location
under
the
rack.
7.
Create
a
rack-mounting
bolt
assembly
by
adding
the
following
items,
in
the
order
listed,
to
each
rack-mounting
bolt.
a.
Thin
washer
b.
Top
plastic
isolator
bushing
c.
Thick
flat
washer
d.
Spacer
8.
Insert
a
rack-mounting
bolt
assembly
through
each
of
the
leveling
feet.
9.
Reposition
the
rack-mounting
plates
under
the
four
rack-mounting
bolts
so
that
the
mounting
bolts
are
centered
directly
over
the
threaded
bolt
holes.
10.
Turn
the
rack-mounting
bolts
four
complete
turns
into
the
mounting
plate’s
threaded
bolt
holes.
Figure
9.
Installing
ac-power
mounting
plates
16
Installation
Guide
for
the
03E/4A,
07M/15,
and
08M/25
Summary of Contents for PL160R
Page 1: ...PL160T R PL260T T and PL460T R Installation Guide ESCALA REFERENCE 86 A1 55EW 01...
Page 2: ......
Page 10: ...viii Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 12: ...2 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 14: ...4 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 54: ...44 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 96: ...86 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 98: ...88 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 105: ......
Page 106: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 55EW 01...