12.
After
both
rails
have
been
installed,
ensure
that
none
of
the
rail’s
retaining
screws
are
more
than
finger-tight.
The
rails
must
be
level
from
front
to
back
and
from
left
to
right.
Installing
the
cable-management
arm
You
might
need
to
install
the
cable-management
arm.
Use
the
procedure
in
this
section
to
perform
this
task.
To
install
the
cable-management
arm,
complete
the
following
steps:
1.
Determine
on
which
side
of
the
rack
you
want
to
install
the
cable-management
arm.
2.
Place
the
correct
arm
bracket
(Left
or
Right)
with
the
cable-management
arm.
3.
Use
pin
F
to
pin
the
cable-management
arm
E
to
the
rack
frame
D
as
shown
in
Figure
36.
Tip:
If
access
to
the
back
of
the
rack
is
obscured
by
a
large
number
of
existing
cables,
it
might
be
easier
to
remove
the
small
connecting
hinge
from
the
cable-management
arm
and
attach
it
first.
Then,
you
can
attach
the
remaining
section
of
the
cable-management
arm
to
the
connecting
hinge.
4.
Use
the
second
pin
F
to
pin
the
other
end
of
the
cable-management
arm
to
the
flange
C
that
is
attached
to
the
sliding
portion
of
the
left
system
rail
assembly
B
as
shown
in
Figure
36.
Figure
36.
Attaching
the
cable-management
arm.
Chapter
2.
Installing
your
system
in
a
rack
43
Summary of Contents for PL160R
Page 1: ...PL160T R PL260T T and PL460T R Installation Guide ESCALA REFERENCE 86 A1 55EW 01...
Page 2: ......
Page 10: ...viii Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 12: ...2 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 14: ...4 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 54: ...44 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 96: ...86 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 98: ...88 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Page 105: ......
Page 106: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 55EW 01...