
MyLab
- G E T T I N G S T A R T E D
4 - 1
Chapter
4
GETTI
NG STARTED
4- System Components and
Installation
The system will be installed by Esaote personnel. Esaote personnel will be
responsible for opening the packaging and ensuring that the system is correctly
programmed and operational. This chapter provides an overview of the system
components and the major operations that may be necessary.
System Overview
MyLab
has a built-in LCD screen: in this way, the system can be used as portable
configuration.
MyLab
can be supplied with a trolley in its mobile configuration.
Portable Configuration
The console contains: the electronics, the control
panel with speakers, the probe connectors (on the
back), the input/output connectors for the ECG,
the network and the peripherals and the security
lock connector.
The ON/OFF button is located on the upper left
part of the control panel; the batteries status led is
located on the lower left side of the control panel.
The console is equipped with an handle that can be used to move the system.
The system is equipped with an external AC/DC adapter and internal batteries.
Optional the unit can be equipped with mains filter.
Summary of Contents for 350009500
Page 1: ...Rev 02 April 2016 MyLabDelta GETTING STARTED 350009500 ...
Page 10: ...MyLab G E T T I N G S T A R T E D 6 ...
Page 17: ...MyLab G E T T I N G S T A R T E D 1 7 GETTING STARTED ...
Page 18: ...MyLab G E T T I N G S T A R T E D 1 8 ...
Page 19: ...MyLab G E T T I N G S T A R T E D 1 9 GETTING STARTED ...
Page 26: ...MyLab G E T T I N G S T A R T E D 1 16 ...
Page 34: ...MyLab G E T T I N G S T A R T E D 2 8 ...
Page 40: ...MyLab G E T T I N G S T A R T E D 3 6 ...
Page 68: ...MyLab G E T T I N G S T A R T E D 5 12 ...
Page 76: ...MyLab G E T T I N G S T A R T E D 6 8 ...
Page 88: ...MyLab G E T T I N G S T A R T E D 7 12 ...