OPERATION
49
5. Once the Pilot Arc is established, if the torch is close enough to the work, and the work piece is grounded,
Main Arc will transfer to work. Once main arc is established, which will be verified by sensing the work
current through HS2 (work current greater than 5A), power supply will send the Arc ON signal to CNC/
Process Controller via CAN and begins to ramp up current in accordance with the TDF file or the internal
matrix.
6. After a cut is finished or stop signal is sent from the CNC/Process Controller, power supply ramps down
the current according to TDF/SDP file, the fan stays ON and the K1 contactor remains closed for 5 min-
utes. If another start signal is sent prior to the 5 minutes time out, as the bus filter capacitor voltage will
be at 360 VDC, power supply will not go through the soft start sequence.
7. After the 5 minutes timer timed out, main fan turns off and K1 opens. Now, if a start signal is sent, the
EPP-202 will perform the sequence of operations - steps 1 through 6.
In case of MARKING, CNC/Process Controller will send the marking mode ON signal to power source via CAN
Communication. Power source then closes RB1-5 relay to send 115 VAC to RAS box where the marking mode VDR
ratio is selected for proper operation. The rest of operation is same as mentioned in steps 1 through 7 from the
plasma unit.
COOLANT
CIRCULATOR
machine operation flow Diagram
Summary of Contents for 0558011310
Page 2: ...EPP 202 Plasma Power Source 2...
Page 4: ...EPP 202 Plasma Power Source 4...
Page 7: ...SAFETY...
Page 8: ...SAFETY 8...
Page 21: ...DESCRIPTION...
Page 22: ...description 22...
Page 25: ...INSTALLATION...
Page 26: ...installation 26...
Page 39: ...installation 39 J1 RAS Interface Cable CAN Cables...
Page 40: ...installation 40...
Page 41: ...OPERATION...
Page 42: ...OPERATION 42...
Page 50: ...OPERATION 50...
Page 51: ...MAINTENANCE...
Page 52: ...Maintenance 52...
Page 57: ...TROUBLESHOOTING...
Page 58: ...58 TROUBLESHOOTING 58...
Page 65: ...REPLACEMENT PARTS...
Page 66: ...Replacement Parts 66...
Page 68: ...Replacement Parts 68...
Page 69: ...revision history 1 Originally released 01 2015 2 Revision 10 2015 added RotorFlow Sensor...