Operating Instruction
Spindle lifting system SL/SM compact
Document no.: B-00061
Edition 2018 02
operating instruction EN
Copyright by Ergoswiss AG
16/23
6
Synchronous operation of 2, 3 or 4 control boxes
6.1
Cable connections
Up to three lifting elements can be connected to one control box. By cascading multiple control boxes they
can be operated by one manual control switch at the same time. The control boxes can be interconnected
with the SYNC-2 or with the SYNC-4 cable.
PXD SYNC-2 cable
With the SYNC-2 cable two control boxes PXD compact can
be connected and synchronised.
The length of the SYNC-2 cable is 550 mm.
The SYNC cable cannot be extended. If necessary, the motor
cables can be extended!
NOTE
Always do reset before disconnecting!
Disconnect plug carefully -> risk of damage
PXD SYNC-4 cable
With the SYNC-4 cable 2, 3 or 4 control boxes compact-3-eco
can be connected and synchronised.
The length of SYNC-4 cable is 1
’
800 mm.
Two connected SYNC-4 cables have a length of 2
’
000
mm.
Each control box needs one SYNC-4 cable.
The SYNC cable cannot be extended. If necessary, the motor
cables can be extended!
The SYNC-4 cables of each control box are to be connected.
The loose ends do not have to be connected. However,
connecting the loose ends will not have any influence
to the system.