
EZ 1000 Series II Melter Part Manual
Chapter 5 Operating Instructions
©2019 by Crafco, Inc. All Rights Reserved………………..…………………………………..….Operating Instructions 5-17
Step
Action
1
Close recirculation valve and reverse the pump for approximately 3 minutes.
1a
Remove wand from hose and wrap hose up in oven while reversing the pump.
2
Close the “APPLICATOR VALVE”.
3
Open recirculation valve. Close the “TANK VALVE”.
4
Turn “Off” pump reverse switch.
5
Turn the mixer toggle switch to the “OFF” position.
6
Turn the “Power” switch to the “OFF” position.
7
Stop the engine by turning the key to the “OFF” position.
IMPORTANT
:
Ensure the hose is not touching the tank wall or plumbing.
Step
Action
1
Close recirculation valve and reverse the pump for approximately 3 minutes.
1a
Remove wand from hose and wrap hose up in oven while reversing the pump.
2
Close the “APPLICATOR VALVE”.
3
Open recirculation valve. Close the “TANK VALVE”.
4
Turn “Off” pump reverse switch.
5
Turn the mixer toggle switch to the “OFF” position.
6
Turn the “Burner” switch to the “OFF” position.
7
Stop the engine by pressing the “OFF” button once. This will throttle down the engine
and shut it “OFF”. It will continue to run for a few seconds.
8
Turn “OFF” key switch.
IMPORTANT:
Ensure the hose is not touching the tank wall or plumbing.
Table 5-18 Shutting Down 46200SB
Table 5-19 Shutting Down 47600SC100
Summary of Contents for Crafco 46200EB
Page 1: ...Parts Manual 26458 Revision Q ...
Page 16: ......
Page 18: ......
Page 26: ......
Page 48: ......
Page 66: ......
Page 196: ......
Page 200: ......
Page 201: ......
Page 202: ... 2019 Crafco Inc ...