Instruction manual for installation and operation of automatic pellet burner “ERATO GP20+”
(Version :
02.02.2010 10:36
)
p.
23/50
relative higher that the operating temperature of the unit, as well as the
chimney’s draught is decreased.
Comment :
•
At the period of fuel ignition an electric heater, positioned below the
inclined grate’s plate, is activated. Both the heater and the plate above are
heated to high temperature levels and certain precautions should be taken
in order not to touch and get skin burned in case of combustion chamber
manual manipulation. In case that manual operation is required (for
example for ash cleaning or fuel management)- self protective measures
and appropriate instruments should be used.
•
During the start-up operation of the burner, the fuel transport auger should
be charged (filled) with fuel – this is long lasting, time consuming period.
In such case it is recommended to plug the auger power supply cord into a
common power supply wall-plug and do the auger charge until fuel starts
to drop from its outlet. After this charge operation the auger’s plug should
be connected to the operating plug of the main unit.
ATTENTION
:
the control board of the burner monitors the presence and
adequate operation of the transport auger and if the auger is not plugged
in the main unit of the burner, then the control board goes in alarm mode
and the burner will not function. In order to go in nominal operation mode
it is necessary to plug the auger power supply in the contact point on the
main module and restart the burner – switch off and back on the power
supply.
Explanation :
if the auger’s power supply cable has been disconnected
from the main unit of the burner (this situation is considered as alarm
mode of the control board of the burner)– i.e. the electric motor is
malfunctioning or wiring problems) and the burner has been switched on,
then the control board indicates this mode by simultaneous lighting the
yellow
and
green
LEDs (light emitting diodes), positioned on its surface
(observed though the transparent windows of the main unit). The reset
process should be performed : the auger should be correctly plugged in the
operating connect point on the main unit, the power should be switched off
and back on.
•
The burner operates by predefined working algorithm, programmed in the
inerasable memory chip on the control board. Optimal values of the
parameters are defined by default at production and in principal no change
is required in order to run the unit;