
Instruction manual for installation and operation of automatic pellet burner “ERATO GP20+”
(Version :
02.02.2010 10:36
)
p.
18/50
Figure 4.4.
Overall and characteristic dimensions of the main unit
–
front
view
;
4.4.
Arrangement and installation of the pellet burner’s modules
•
The main unit
of the burner should be installed in horizontal position on
a heat energy consumer appliance. According to the type of the appliance,
an expert should prepare technical evaluation of the project for
installation of the burner, as well as local arrangement of the units in
order to ensure efficient and reliable system operation and easy access for
cleaning and maintenance purposes. The main unit of the burner should
be attached to the heat energy consumer appliance. The insulation gasket
should be placed between the main unit and the heat energy consumer. A
“L” shape metal plate should be installed in order to activate the “on-
position” switch, which allows operation of the burner.
It is forbidden to
overcome the “on-position” switch function in any ways, as the fire safety
performance of the burner could be influenced
;
•
Fuel transport auger
is positioned in a close region of the burner, in
order to allow its easy connection with fuel delivery pipe of the main unit
by the applied transparent flexible hose. The auger should be positioned at
45
o
– the angle between the axis of the auger and the horizontal plane, in