MAINTENANCE AND INSPECTION
45
9.2 MAINTENANCE SCHEDULE
Daily
Weekly
Yearly
Lubrication
Grease front steering axle (tow behind)
X
Grease auger bearings
X
Grease auger swing arm hinges
X
Air hopper
Check and clean pintle cogs and brushes, check for build-
up underneath the cogs
X
Wash and clean at end of planting season
X
Tyre pressure
Check tire pressures
X
Hydraulics
Inspect and clean oil cooler fins
X
Replace high pressure filter elements
X
Additional maintenance
Interval
Retighten the main and wheel nuts and well as main hinge
points
After the first 20 hectares
thereafter weekly. Also, before
the start of a new season
Summary of Contents for AIR CART
Page 1: ...0 OPERATOR MANUAL AIR CART...
Page 5: ...IDENTIFICATION 4 IDENTIFICATION Record the Air Cart s data on the name tag below...
Page 21: ...FRAME 20...
Page 28: ...AUGER 27 Bottom position Side position Spring bolt...
Page 47: ...MAINTENANCE AND INSPECTION 46 9 3 LOCATION OF GREASE POINTS Front steering axle...
Page 48: ...MAINTENANCE AND INSPECTION 47 Auger A Auger bearing B Inner swing arm hinge A B C D E...
Page 53: ...TROUBLESHOOTING 52 SCHEMATICS...
Page 54: ...TROUBLESHOOTING 53...