Step
Description
Diagram
4.
Run the CCIM, signal light, cutout
harness, machine input harness and
camera cables up through the hole
into the cabin under the dashboard.
Note: Pull the entire length of cable
through into the cabin, excess cable
will be stored under the dashboard
cover in the cabin.
Table 12: External Cable Completion
For further details on running the cables refer to the
Installation Index on page 7
31 of 53
Summary of Contents for Gen-3 LMS
Page 5: ...Appendix B Reattach Ferrites 51 Indexes and Tables 52 VER 1805241756 5 of 53...
Page 9: ...Illustration 1 Machine Boom VER 1805241756 9 of 53...
Page 10: ...Illustration 2 Machine Chassis VER 1805241756 10 of 53...
Page 43: ...Complete the system checklist once installation has been completed VER 1805241756 43 of 53...