Step
Description
Diagram
2.
Disconnect the hose coming from
the spool assembly for the main rod
pressure line.
Note: Some of the existing hoses
connected to the spool assembly will
need to be removed to access the
main rod pressure line.
Connect the supplied hydraulic tee
connection and pressure sensor into
the main rod pressure line.
Ensure the pressure sensor is
aligned as shown in the picture.
Start the machine, pressurise the
boom and check for leaks.
Note: The pressure sensor supplied
may differ from the photo above
View from under the machine to the
spool assembly
Note: The hydraulic connections
supplied differ from the photo above
17 of 53
Summary of Contents for Gen-3 LMS
Page 5: ...Appendix B Reattach Ferrites 51 Indexes and Tables 52 VER 1805241756 5 of 53...
Page 9: ...Illustration 1 Machine Boom VER 1805241756 9 of 53...
Page 10: ...Illustration 2 Machine Chassis VER 1805241756 10 of 53...
Page 43: ...Complete the system checklist once installation has been completed VER 1805241756 43 of 53...