![Epson T3 Series Safety And Installation Download Page 62](http://html.mh-extra.com/html/epson/t3-series/t3-series_safety-and-installation_110810062.webp)
1. Safety
44
Safety and Installation (T, VT / EPSON RC+ 7.0) Rev.15
1.10 End User Training
Persons in charge of safety management should confirm that the operators who
program, operate, and maintain the robot and robot system take proper training and
have expertise to conduct the work safely.
Training should include at least the following:
-
Study of regulation safety procedures, and safety-related recommendations by
robot manufacturers and system designers.
-
Clear explanation of the work involved.
-
Description of all control equipment required for the work and their functions.
-
Explanation of potential hazards involved in the work.
-
Work safety procedures and specific methods of avoiding potential hazards.
-
Safety device and interlock function testing and confirmation methods are
working properly.
Summary of Contents for T3 Series
Page 2: ...Robot System Safety and Installation T VT EPSON RC 7 0 Rev 15 ...
Page 14: ...xii Safety and Installation T VT EPSON RC 7 0 Rev 15 ...
Page 18: ...Table of Contents xvi Safety and Installation T VT EPSON RC 7 0 Rev 15 ...
Page 128: ...7 Directives and Norms 110 Safety and Installation T VT EPSON RC 7 0 Rev 15 ...