Copyright© 2022 SolarV GmbH All rights reserved.
26
Operation:
Step 1:
On the initial interface, press the
button to browse the PV parameters. Then, press
the
button to enter the PV parameters setting interface.
Step 2:
Long-press the
button to enter the LCD cycle time interface.
Step 3:
Press the
button or the
button to set the LCD cycle time.
Step 4:
Press the
button to confirm.
5
˅
˅
Clear the accumulated electricity
Operation:
Step 1:
On the initial interface, press the
button to browse the PV parameters. Then, press
the
button to enter the PV parameters setting interface.
Step 2:
Long-press the
button to enter the LCD cycle time interface, and the cycle time
flashes.
Step 3:
Hold the
button and the
button for 5 seconds to clear the accumulated
electricity.
Note: Return to the PV parameters interface to confirm whether the accumulated electricity
(kWH) is zero.
6
˅
˅
Local load type (with the RCS module)
Operation:
Step 1:
On the initial interface, press the
button to browse the load parameters. Then,
press the
button to enter the load parameters setting interface.
Step 2:
Long-press the
button to enter the load type interface.
Step 3:
Press the
or
button to change the load type.
Step 4:
Press the
button to confirm.
NOTE: Please refer to chapter 5.2 for the load working mode.
Summary of Contents for SolarV TRIRON Series
Page 1: ......
Page 18: ...14 3 Modules installation Copyright 2022 SolarV GmbH All rights reserved...
Page 19: ...15 Copyright 2022 SolarV GmbH All rights reserved...
Page 59: ......