34
EN
Maintenance
Lubricate the ball bearings.
• Cut the cable ties.
• Lift the foam cover off.
• Grease the ball bearings.
• Place the foam cover on top and affix with a
cable tie.
Remove the covers
Servicing requires the hood to be open.
• Remove the mains plug.
• Lift the hood off the housing.
Maintenance interval
The flake ice machine must be serviced every
six months.
The cooling system for ice production is a
closed system with 0,36 kg R134a gas. Normal-
ly, no refill is necessary.
Fig. 11
Cover
Water supply for
ice production
Insulation foam
cover of the refrig-
erating cylinder
Floater housing
Sensor bridge
Maintenance involves the following tasks:
• Lubricate the ball bearing
• Refill the disinfectant or replace the tank.
• De-scale the water circuit.
Maintenance work
NOTICE
For reasons of hygiene, we recommend to
disinfect the device after a switch-off time
of 24 hours.
WARNING
Risk of injury from high voltage.
Always disconnect the machine from the
power supply before carrying out any
maintenance or repairs.
Summary of Contents for 94 6220
Page 2: ...2 D...
Page 43: ...43 RU pe PE...
Page 44: ...44 RU 8 12...
Page 48: ...48 RU 1 2 3 4 5 DIN EN 1717 4 5 4 1 2 3 5 8 MIN MAX max 550 mm min 200 mm 8a 8b LEDs LEDs...
Page 49: ...49 RU 6 3 2 3 3 3 10 9...
Page 50: ...50 RU 10 10...
Page 51: ...51 RU...
Page 52: ...52 RU...
Page 53: ...53 RU 360 R134a 11 24...
Page 54: ...54 RU 4 11 1 2 45 50 C 0 1 0 2 PE...
Page 55: ...55 RU 1 2 3 4 11 5 6 7 8 9 10 11 2 12 PE...
Page 59: ...59 RU ASB I II III IV V VI 24 www eos sauna com agb 08 2018...