29
EN
Note!
Excessive voltage fluctuations can impact on
the function of the machine and lead to serious
damage to the electronic control system.
Connection
1
Mains cable with plug
2
Feed line / flake ice machine
3
Feed line / cooling
4
Drain / cooling
5
Drain
• Connect the supply and return lines in com-
pliance with the national and international
guidelines.
• Connect the water supply in compliance
with DIN EN 1717. Observe the technical data
for the water supply.
• Connect the power supply.
Note!
Do not interconnect but separately fit water
drains 4 and 5 to a floor drain. This prevents water
from the cooling system's return pipe from being
pressed into the drain of the condensate dish.
4
1
2
3
5
Before taking out ice for use, remove
the ice added to the ice tray during the
disinfection phase.
Fig. 8
MIN
MA
X
Switching point
for ice level
detection
max. 550 mm
min 200 mm
adjust the gap
Adjust the ice level detection
Fig. 8a
Fig. 8b
Light sensor for wall-
mounting installation
LEDs
LEDs
green = in operation
yellow = switching point
Disinfection!
Once a month or after an interruption of the
ice preparation of 24h
• Water temperature for cooling and ice tem-
pe 5 ° to 24 ° C
• Water pressure between 1 - 5 bar
• Room temperature / ambient tempe
10 ° - + 40 ° C
• Distance between the device and the wall at
least 150 mm to ensure proper air circulation
• Water drain hose should have a minimum
gradient of 3 cm per / m
Summary of Contents for 94 6220
Page 2: ...2 D...
Page 43: ...43 RU pe PE...
Page 44: ...44 RU 8 12...
Page 48: ...48 RU 1 2 3 4 5 DIN EN 1717 4 5 4 1 2 3 5 8 MIN MAX max 550 mm min 200 mm 8a 8b LEDs LEDs...
Page 49: ...49 RU 6 3 2 3 3 3 10 9...
Page 50: ...50 RU 10 10...
Page 51: ...51 RU...
Page 52: ...52 RU...
Page 53: ...53 RU 360 R134a 11 24...
Page 54: ...54 RU 4 11 1 2 45 50 C 0 1 0 2 PE...
Page 55: ...55 RU 1 2 3 4 11 5 6 7 8 9 10 11 2 12 PE...
Page 59: ...59 RU ASB I II III IV V VI 24 www eos sauna com agb 08 2018...