4.2 MAINTENANCE
CALENDAR
Due to its design, the MIR 9000 requires simplified maintenance only.
However, to guarantee its described characteristics for continuous operation, maintenance should be
carried out frequently on the analyzer.
During the period after its initial start-up and before its actual use, it is necessary to monitor the
evolution of the installation judiciously by paying a daily visit. After this short period of 5 days, a weekly
inspection visit will be sufficient. During this visit it will be possible to make up the maintenance
calendar for the user site in a precise way.
The interval between two visits is usually 1 month.
Nature of the operations
Frequency
Sheet no.
–
Replacing the dust filters.
1 month
4.3.1
–
Inspection of all metrological parameters of chan-
nels 1 to 16 of the multiplexer.
1 month
4.3.2
–
Inspection of the pump.
6 months
4.3.3
–
Inspection of the related equipment
1 month
4.3.4
–
Inspection of flows and cleaning of the restrictors.
1 month
4.3.5
–
Replacing the motor.
1 year
4.3.6
–
Replacing the infrared source.
Depending on need
4.3.7
–
Replacing the optical forks.
Depending on need
4.3.8
–
Inspection of calibration.
Depending on need
4.3.9
4.3
MAINTENANCE OPERATION SHEETS
CAUTION - DANGER
–
During internal inspection under voltage, there is 230 or 100 volts present on some connectors.
–
Do not use trichlorethylene or acetone for the cleaning of the various components.
Summary of Contents for Envea MIR 9000
Page 10: ...Duplication prohibited MIR 9000 EnvironnementS A 0 10 JULY 2009 Page intentionally left blank...
Page 22: ...EnvironnementS A MIR 9000 Duplication prohibited 1 12 JULY 2009 Figure 1 7 Analysis cabinet...
Page 27: ...Duplication prohibited MIR 9000 EnvironnementS A 1 17 JULY 2009 Page intentionally left blank...
Page 35: ...Duplication prohibited MIR 9000 EnvironnementS A 2 5 JULY 2009 Page intentionally left blank...
Page 102: ...EnvironnementS A MIR 9000 Duplication prohibited 4 2 JULY 2009 Page intentionality left blank...
Page 157: ......
Page 159: ......
Page 161: ......
Page 163: ...EnvironnementS A MIR 9000 Duplication prohibited 6 10 JULY 2009 Figure 6 4 Oxygen probe...
Page 165: ...EnvironnementS A MIR 9000 Duplication prohibited 6 12 JULY 2009 Page intentionally left blank...
Page 180: ...EnvironnementS A MIR 9000 Duplication prohibited 6 22 JULY 2009 Page intentionally left blank...
Page 182: ...EnvironnementS A MIR 9000 Duplication prohibited 7 2 JULY 2009 Page left intentionally blank...
Page 206: ...EnvironnementS A MIR 9000 Duplication prohibited 7 28 JULY 2009 Page left intentionally blank...
Page 212: ...EnvironnementS A DAC8 board Duplication prohibited MARCH 2018 6 Page intentionally left blank...