![Enviro Westport-Cast Owner'S Manual Download Page 13](http://html1.mh-extra.com/html/enviro/westport-cast/westport-cast_owners-manual_2415821013.webp)
13
Using a ½" deep
socket remove/reinstall
the main burner orifice.
Undo the two
(2) screws that
hold burner in
the firebox.
Rotate handles
and remove the
door and glass.
Lift off the pilot
head and replace
with proper pilot
orifice for fuel type
to be used.
Venturi adjustment
bracket.
Pilot assembly moved
from firebox for clarity.
Figure 8: Unit burner shown apart.
Maintenance And Service
4. Remove the burner as shown in the
M
aIntenance
and
s
ervIce
- b
urner
r
eMoval
.
5. Convert the burner orifice(s):
a) Remove the main burner orifice with a ½ inch deep socket.
b) Put a bead of pipe-thread sealant or approved Teflon tape on the orifice threads before installing into
the brass elbow.
c) Install the new orifice(s) from the kit into the brass elbow.
6. Convert the pilot:
a) Pull the pilot hood straight up to access the pilot injector.
b) Using a
5
/
32
” or 4 mm Allen key, remove the pilot injector.
c) Install the new pilot injector supplied with this conversion kit (Figure 9). Simply screw the new
injector inside the pilot hood using the Allen key. Reinstall the hood by placing the hood on the
assembly, line up the key way, and snap into place (Figure 10).
Warning: This conversion kit shall be installed by a qualified service agency in accordance
with the manufacturer’s instructions and all applicable codes and requirements of the
authority having jurisdiction. If the information in these instructions is not followed
exactly, a fire, explosion or production of carbon monoxide may result causing property
damage, personal injury or loss of life. The qualified service agency is responsible for
the proper installation of this kit. The installation is not proper or complete until the
operation of the converted appliance is checked as specified in the manufacturer’s
instructions supplied with the kit.
Kit Parts List:
F
ueL
c
onveRsion
:
1 - Orifice (NG -
#39 DMS or LP - #53 DMS)
1 - Pilot Injector (NG
0.62 mm; LP 0.35 mm)
1 - Installation instruction sheet
1 - Conversion label
Carefully inspect all parts supplied with this
conversion kit. If any parts have been damaged
or are missing, contact your dealer, distributor or
courier company to have them replaced before
starting this installation.
Conversion Kit Installation:
1. Turn control knob on the gas valve to the
“OFF” position and shut the gas supply off
at the shut-off valve upstream of the unit.
CAUTION: The gas supply must be shut off
prior to disconnecting the electrical power
and before proceeding with the conversion.
Allow the valve and unit to cool down to room
temperature.
2. Remove the glass as shown in the
M
aIntenance
and
s
ervIce
- G
lass
d
oor
r
eMoval
.
3. Carefully remove the log set and ember
material if they are installed.
TO BE INSTALLED BY A QUALIFIED SERVICE AGENCY ONLY
Please read and understand these instructions before installing.