Maintenance And Service
b
uRneR
R
emoVaL
:
The burner may need to be removed for a few reasons, including cleaning under the burner or to be
replaced all together.
Proceed only when the unit has completely cooled down.
Figure 10. Removing Burner
Step 1:
Remove the glass door as shown in
the
M
aIntenance
anD
s
erVIce
- G
lass
D
oor
r
eMoVal
.
Step 2:
Remove the log set and fire grate
as shown in S
econDary
I
nstallatIon
- F
Ire
G
rate
anD
l
oG
s
et
I
nstallaIon
Step 3:
Pull the burner out of the venturi box
and out.
To re-install the burner follow steps 1-3
in reverse. When placing the burner back
in the unit be sure not to move the air
shutter. Insure the front and rear lengths
of the burner tube are parallel as it may
have distorted with heat over time. The
ideal placement for the burner tube
is keeping it forward up against the
burner stand stops.
DATE: 7/18/2014
BY
SHERWOOD INDUSTRIES LTD.
INTERNAL ASSEMBLY MANUAL
THIS DRAWING IS THE PROPERTY OF SHERWOOD INDUSTRIES LTD. AND MAY NOT BE COPIED, REPRODUCED, OR OTHERWISE DISCLOSED WITHOUT THE PRIOR APPROVAL OF SHERWOOD INDUSTRIES LTD.
1 of 2
SHEET:
Q2 (DV33) - R04
STOVE:
UPDATED: ----/--/--
BY --
REVISION:
0.0
DATE: 8/6/2014
BY
SHERWOOD INDUSTRIES LTD.
INTERNAL ASSEMBLY MANUAL
THIS DRAWING IS THE PROPERTY OF SHERWOOD INDUSTRIES LTD. AND MAY NOT BE COPIED, REPRODUCED, OR OTHERWISE DISCLOSED WITHOUT THE PRIOR APPROVAL OF SHERWOOD INDUSTRIES LTD.
1 of 1
SHEET:
STOVE:
UPDATED: ----/--/--
BY --
REVISION:
0.0
Figure 11. Removing Access Door
a
ccess
D
ooR
:
Step 1
: Remove the burner as
shown in the
M
aIntenance
anD
s
erVIce
- B
urner
r
eMoVal
.
Step 2:
Remove the Upper Air
Diverter by removing (2) T-20
bolts. Remove the Lower Air
Diverter.
Step 3
: Remove the right and
left burner stands by removing
(4) T-20 bolts.
Step 4
: Remove the (16) T-20
bolts retaining the access door
as shown in Figure 11.
Step 5
: After serviving assemble
in the reverse order and be
sure the gasket is still intact.
Replace if necessary.
There is an access door in the bottom on the firebox that is used for servicing components after the unit is
installed in a construction enclosure.
Proceed only when the unit has completely cooled down.
Page 12