ENSTROM F-28F/280F SERIES MAINTENANCE MANUAL
Rev.
8
MM-4-59
Sep
20/17
4-54. Special Scheduled Inspection Guide – Periodic Inspection
AIRCRAFT REGISTRATION NUMBER:
SIGNATURE:
AIRCRAFT SERIAL NUMBER:
DATE:
HOURS: Engine:
Flight:
SPECIAL SCHEDULED INSPECTION GUIDE
INITIAL EACH ITEM AFTER ACCOMPLISHMENT
INITIAL
1. MAIN
ROTOR
TRANSMISSION
A. Retorque the aft pinion nut 20-25 hours after installation.
_________
2. PYLON
ASSEMBLY
A.
Inspect the pylon I/A/W SIL 0173 every 10 hours time in service for aircraft used
for agricultural or external load operations during that time period.
_________
3. HORIZONTAL
STABILIZER
A. For aircraft F-28F S/N 744 and subsequent and all 280FX, remove and
disassemble the horizontal stabilizers and spar at the first 1200 hours of service
and every 1200 hours of service thereafter for the inspection of the following:
NOTE: Refer to Section 8, Paragraph 8-16 for complete disassembly,
assembly, and inspection criteria.
1) Visually inspect all components for damage, cracks, loose rivets, and
security of installation.
_________
2) Fluorescent inspect (Zyglo) or visually inspect with a 10 power glass the
spar fitting, attachment rivets, bulkhead and vertical endplate attachments.
_________
3) Magnetic particle inspect the horizontal stabilizer steel spar.
_________
UNCONTROLLED COPY WHEN DOWNLOADED OR PRINTED
Visit www.enstromhelicopter.com for instructions to order an original manual and to register for email notification of updates.