9a
Slide the
Intermediate jamb
into the
Head channel
and
Base channel
with the
Timber inserts
facing out so it sits centrally
in the pocket. Fix using
Type-1
screws.
9b
Slide the
Leading edge jamb
into
Base
channel
with notched end at the top, so the
flange sits hard against the end of the
Base
channel
. Plumb the jamb and fix into place
using one
Type-1
screw top and bottom as
shown in the image. Must be posited furthest
from the opening.
FIT POCKET SIDES & FIX THE JAMB
9
9a
9b
‘
8
M O T U S N F R V › I N S T A L L A T I O N G U I D E
|
F R A M E I N S T A L L AT I O N
1 5
Single doors
Push the kettle lead in the strike end of the
track. Run the excess cable behind the strike
trim packer to the plug.
DO NOT power on at
this point.
Double doors
Remove the kettle lead ports on both tracks.
As standard; Motus Double doors utilise a
Sync unit
to open both doors at the same time,
additional wiring is required - See
p18
.
For
Hardwired power
supply please see
p28
.
CONNECTING THE TRACK
Cut the
Brush Strip
to length and fit to the
leading edge aluminium profile.
IMPORTANT
If using simultaneous opening ensure that the door leafs
and head trims have been fitted. Refer to the simultaneous
opening instructions for more.
FIT BRUSH STRIP
10