
54
Solution 1.6 Installation and Operation Manual
Note that secondary air tubes (A) can be replaced without removing the baffle board (B).
Important Notes:
The air tubes are identified for placement as follows:
Model
Type of tube
Solution 1.6
Front
►
30 holes of 0.140"
Middle front
►
30 holes of 0.136’’
Middle rear
►
20 holes of 0.147’’
Rear
►
15 holes of 0.128’’
Summary of Contents for Solution 1.6 AGENCY PHASE II CERTIFIED WOOD
Page 8: ...8 Solution 1 6 Installation and Operation Manual ...
Page 32: ...32 Solution 1 6 Installation and Operation Manual Clearances for shield construction ...
Page 49: ...Solution 1 6 Installation and Operation Manual 49 Floor installation ...
Page 55: ...Solution 1 6 Installation and Operation Manual 55 Appendix 9 Exploded Diagram and Parts List ...