![Enerzone Solution 1.6 AGENCY PHASE II CERTIFIED WOOD Installation And Operation Manual Download Page 12](http://html.mh-extra.com/html/enerzone/solution-1-6-agency-phase-ii-certified-wood/solution-1-6-agency-phase-ii-certified-wood_installation-and-operation-manual_2411798012.webp)
12
Solution 1.6 Installation and Operation Manual
3.2.3 Log Length
Logs should be cut about 1” (25 mm) shorter than the firebox so they fit in easily. Pieces that are
even slightly too long make loading the stove very difficult. The most common standard length of
firewood is 16” (400 mm).
The pieces should be a consistent length, with a maximum of 1” (25 mm) variation from piece to
piece.
3.2.4 Piece Size
Firewood dries more quickly when it is split. Large unsplit rounds can take years to dry enough to
burn. Even when dried, unsplit logs are difficult to ignite because they don’t have the sharp edges
where the flames first catch. Logs as small as 3” (75 mm) should be split to encourage drying.
Wood should be split to a range of sizes, from about 3” to 6” (75 mm to 150 mm) in cross section.
Having a range of sizes makes starting and rekindling fires much easier. Often, the firewood
purchased from commercial suppliers is not split finely enough for convenient stoking. It is
sometimes advisable to resplit the wood before stacking to dry.
Summary of Contents for Solution 1.6 AGENCY PHASE II CERTIFIED WOOD
Page 8: ...8 Solution 1 6 Installation and Operation Manual ...
Page 32: ...32 Solution 1 6 Installation and Operation Manual Clearances for shield construction ...
Page 49: ...Solution 1 6 Installation and Operation Manual 49 Floor installation ...
Page 55: ...Solution 1 6 Installation and Operation Manual 55 Appendix 9 Exploded Diagram and Parts List ...