Solution 1.6 Installation and Operation Manual
43
6- Gently flip the stove back
on its pedestal making
sure not to put too much
weight on the rear edge of
the base.
7- Open the ash drawer (h)
lid then slide it into the
front
opening
of
the
pedestal.
8- Position the stove for its
installation and reinstall
the bricks, ash plug and
loading
door
(see
Appendix 9: Exploded
Diagram and Parts List
for bricks layout).
Note: Make sure that baffle
components have not moved
during the leg installation
process since a flue blockage
may occur.