
42
Solution 1.6 Installation and Operation Manual
Pedestal kit installation:
Follow step 1, 2 and 3
4- Install the dashboard (e) to
the pedestal (g) with 2
screws (f). Then, secure
the pedestal backing panel
to the rear of the pedestal.
5- Secure pedestal base to
the
underside
of
the
firebox using the bolts,
washers
and
nuts
removed in step 3.
Note: Insert each bolt from the
inside of the firebox, this will
allow the bricks to sit more
evenly on the floor of the
firebox.
Summary of Contents for Solution 1.6 AGENCY PHASE II CERTIFIED WOOD
Page 8: ...8 Solution 1 6 Installation and Operation Manual ...
Page 32: ...32 Solution 1 6 Installation and Operation Manual Clearances for shield construction ...
Page 49: ...Solution 1 6 Installation and Operation Manual 49 Floor installation ...
Page 55: ...Solution 1 6 Installation and Operation Manual 55 Appendix 9 Exploded Diagram and Parts List ...