9.4 Installation guide
1. Do not install directly in a place where the rain can caught.
2. Should use the vertical wall hanging installation.
3. Battery, load, light panels at the positive and negative do not reserve.
4. Load power should not be over the power rating or electric current.
5. Ensure controller ventilated smooth, good heat dissipation.
6. Should be regularly check controller working status, promptly eliminate adverse impact.
9.5 Terminals specifications
1. Solar - (negative): solar charging negative input
2. Solar + (positive): solar charging positive input
3. R: wind generators U phase input
4. S: wind generator V phase input
5. T: wind generator W phase input
6. -2: The second loaded negative output
7. +2: The second loaded positive output
8. -1: The first loaded negative output
9. +1: The first loaded positive output
10. B: Batteries positive input
11. Battery -: Batteries negative input
9.6 Instalation steps
1. Check whether the controller and fan, solar cells and batteries voltage, power match.
2. Use a multimeter to check weather the battery voltage is correct, and confirm the battery
anode.
3. Connect the battery pack to the controller.
4. The wind generator connected to the controller. (When the wind generator is high speed
rotating should not be installed.)
5. Use a multimeter to check weather components test voltage is correct. (Components test
open voltage is higher than nominal voltage of 1.5 times or so, this is normal).
6. Connect solar cells to the controller. (optional) Note polarity!