Operation Instruction of BS Series Solar Pumping Inverter
Operation Control
26
cellphone number. Send messages to set startup, shutdown, parameter inquiry, etc.
Warning: do not change menu S00 parameters. The default mode is fully-automatic work
mode.
3.4 Introduction to the Procedure of Wiring and Debugging
3.4.1 Procedure of Power Supply Debugging of Solar Cell
1. Conduct wiring according to system diagram and check whether wiring is correct or not.
After confirming it, turn on Q2.
Solar cell panel
Water level switch
Impounding
Reservoir
S
olar
pumpi
ng
inver
ter
DC switch