Programming - First steps
P.
74 of 349
Step 6 – Transfer the program and open the browser
The program has to be transferred to the EibPC.(F3).
Should the situation arise it could come to delays after the transfer, because all statuses are
requested for the webserver.
The webserver in the EibPC will be called by the input of the IP in the address line of the browser.
Picture: Webserver Example 33:
If you wish to get in deeper into the surface programming, please read the following chapter carefully.
HandbuchEibPC_USA-30.odt, 2017-05-11
Enertex
®
Bayern GmbH - Erlachstraße 13 - 91301 Forchheim - [email protected]